PROJECT DATA

La Mer, Jumeirah: top pour results on protection wall

Project: Protection wall for a land reclamation infrastructure project in Jumeirah, UAE

Developer: Meraas Holding, Dubai, UAE

Contractor: Integrated Construction Company LLC.

MEVA System and Solution: Wall formwork Mammut 350, Special designs

Engineering and support: MEVA KHK Formwork Systems, Dubai, UAE

 
 
1
2
3
4
5
6
7
8
9
 

PROJEKT

La Mer, Jumeirah: top pour results on protection wall

The La Mer project is one of a number of ambitious infrastructure developments with which the United Arab Emirates is cementing its image as a prestigious commercial and residential hub. A vast 950,000 m² of land have been reclaimed from the Arabian Sea on which to build hotels, residential buildings, shopping and entertainment centers. The reclamation of land centers around two peninsulas with beaches and a southern island.

A long, curved shore protection wall with an offset crown and a slanted inside surface required special formwork expertise to come up with a flexible and viable solution. Integrated Construction Company consulted MEVA KHK Formwork Systems in Dubai, a leading supplier of formwork solutions in the region with a wellequipped rental fleet. An experienced team of experts used the Mammut 350 wall system as a basis to pour the straight and slanted wall sections with adapted support. The bend in the long supporting wall was achieved by using a wedge-shaped compensation between the panels. This proved to be the best solution, both economically and technically. Site management are particularly pleased with the impeccably smooth
concrete finish on the long wall with its complicated geometry. This is achieved thanks to the Mammut 350’s alkus all-plastic facing, which is a worldwide standard in MEVA formwork systems.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.