PROJECT DATA

Aquinas College in Nashville breaks ground on new construction

Project: Aquinas College, Siena Hall Women’s Residences

Contractor: Lithko Concrete Contractors Nashville, TN

MEVA Systems: Slab formwork system MevaDec, All-plastic facing alkus, Shoring system MEP, Slab formwork MevaFlex

Engineering and support: MEVA Formwork Systems, Inc. Springfield, OH

 
 
1
2
3
 

Project

Quick, Easy Slab Pours with MevaDec

For the first time in 39 years, Aquinas College in Nashville, Tennessee broke ground on new construction. Siena Hall will provide housing for 99 female students on 3.5 stories and 44,000 ft². The project also includes renovation of an academic building next door. This is the very first on-campus residence in the history of Aquina College and is the also the first stage of a planned five year, $30 million construction process that will bring additional residences and academic buildings.

Lithko Concrete Contractors provided the concrete construction with general contractor BL Harbert International. MevaDec slab formwork and the MEP shoring system were selected as the main formwork to pour the decks, assisted by MevaFlex in smaller areas. The slabs were formed with minimal filler areas. MevaDec also offers great flexibility in its ability to switch forming direction, keeping assembly fluid despite the number of concrete beams. There is no fixed grid, reducing filler areas to a minimum and it is easy to adapt to the needs of different floors.

MevaDec proved the quickest solution, providing for easy and fast setting and handling. It does not require a crane and can be set up by only two workers.

MevaFlex complements MevaDec
The MevaDec slab system includes a drop Head that allows for early stripping and cycling, reducing inventory, minimizin labor and saving money.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.