PROJECT DATA

Switching to New Energy

Project: Block power plant for E.on. Hanse Wärme GmbH, Northern Germany

Contractor: Depenbrock Bau GmbH & Co. KG, Stemwede

MEVA Systems: Wall formwork Mammut, Shoring tower MEP, Slab formwork MevaFlex

Formwork Engineering: MEVA Schalungs-Systeme, Northern branch, Germany

 
 
1
2
3
 

Project

Switching to New Energy: Block power plant for E.on. Hanse Wärme GmbH

A new block power plant is being built near Hamburg by public works. It will be the largest in northern Germany, delivering 9.5 MW. When going into operation at the end of 2014, it will supply 21,500 households with electricity and 80 m kWh heat. The layout covers 36 x 18 m. The 8 m walls were poured using Mammut wall formwork.

The architects demanded a superior concrete finish that was easily achieved with the panels‘ all-plastic facing alkus. Two 2.50 m panels were ganged on a 3 m panel to achieve the pour height. The 30 and 40 cm thick slabs were poured at heights of 5.50 m, 8.00 m and 10.50 m using MevaFlex formwork on MEP shoring towers. MEVA engineers provided a detailed pour and inventory plan to ensure smooth work flow throughout the project.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.