PROJECT DATA

Burj Khalifa: Breaking record after record

Project: Burj Khalifa, Dubai

Developer: Turner Construction International

Contractor (and Architects): Joint Venture: Samsung Corporation (South Korea), Besix (Belgium), Arabtec (Dubai)

MEVA Systems: MevaDec (FTE-method)

Formwork Engineering: MEVA Formwork-Systems, Haiterbach

 
 
1
2
3
4
5
6
7
8
9
10
11
12
 

Project

The Burj Khalifa – the Tower of Dubai

MevaDec slab formwork system achieved a record-breaking

The Burj Khalifa will be the highest building ever erected by mankind. The exact height is a being kept secret in order not prevent any competitor surpassing it. The final height will exceed 800 m (2,625 ft). After completion in 2009, 35 million visitors from all over the world are expected every year. The Burj will beat a long list of records: It will bet he highest structure ever, the building with the highest habitable level and the highest viewing platform. In June 2007, the Burj Dubai surpassed the Tapei 101 and reached the status of being the highest building in the world.

The Desert Flower: Design of the Burj Khalifa
The tower is composed of three elements arranged around a central core. A Y-shaped floor plan maximizes views of the Persian Gulf. As the tower rises, it tapers to minimise wind impact which is awesome: the antenna at the top of the Burj is designed for a deflection of +/- 12 m! The tower will cover a floor space of 4.000.000 m². An Armani Hotel with 403 apartments will occupy the lower 37 floors. Floors 45 through 108 will have private apartments. Offices and suites occupy the rest, except for a 123rd floor lobby and 124th floor observation deck, the highest in the world.

Quick-lowering system enables 3 day-per-slab cycle with the MevaDec slab formwork system
The biggest share of the on-site concrete works is dedicated to the slabs totalling 224,808 m² (532 slabs on 154 floor levels) MEVA supplies a complete formwork solution with its slab formwork system MevaDec.
A total of only 3,000 m² of MevaDec slab formwork are required to supply the entire construction process. The slabs are poured at 6 pm formwork is stripped at noon the following day. Two factors help to keep up this pace:

  • The MevaDec drop head with quick-lowering system allows stripping the panels and beams while the props remain as reshoring.
  • The low weight allows the panels to be transferred to the next floor level by using a lifting gear.

100% wood-free, all-plastic facing  avoids re-facing
Plywood facing would have disintegrated after a number of uses, requiring re-facing. Building at great heights, this would have meant costly, time-wasting logistics and handling effort or excessive, expensive inventory. Only the MevaDec with its unique all-plastic, 100% wood-free facing copes with unlimited re-uses and never needs refacing. The MEVA claim was proved true up to level 154, when structural works were completed.

Turner Construction (U.S.A.) acts as project manager for contractor Emaar Properties
The tower, designed by Skidmore, Owings and Merrill, who also designed the Sears Tower in Chicago and the Freedom Tower in New York City, is being built under the auspices of Turner Construction (USA). The consortium consists of Samsung (Korea), BeSix (Belgien) and Arabtec (United Arab Emirates) and is managed by Samsung. As a result of the spotless track record in the Burj Khalifa, Turner Corporation officially recommends the MevaDec slab formwork system as the forming solution in high-rise construction.


 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.