PROJECT DATA

Exclusive residential complex High Park with apartments and retail outlets on Potsdam Square in Berlin

Owner: GSP Städtebau GmbH, Berlin

Contractor: KoHa Bauausführungen und Immobilien GmbH, Berlin branch

MEVA Systems: Wall formwork EcoAs and AluStar for precast concrete jobs on site, Wall formwork Mammut 350, Wall formwork StarTec, Shoring tower MEP, Slab formwork MevaFlex, Heavy duty braces Triplex

Engineering and support: MEVA Formwork Systems, Berlin branch, Germany

 

PROJECT

Exclusive Residence with in-house Metro Connection

High Park Berlin closes the last building gap on Potsdam Square in Berlin

The High Park Berlin residential complex is being built on the last remaining building gap on Potsdam Square, close to Brandenburg Gate in the German capital Berlin. Two towers and a block with up to 14 storeys will house 165 apartments, 38 boarding apartments and 9 retail stores. Contractor is long-time MEVA rental client KoHa.

Metro runs through building site

The construction site is special in more ways than one: The various building sections are being built alongside and above metro line 2, which runs high above ground along this section, and its metro station. In addition a corridor must be left for a future commuter line. This requires high retaining walls along the metro line to support the 22 m long beams that will carry the superstructure spanning the two rail lines and connecting the building blocks to the left and right of them. Careful planning is crucial because the Metro runs its daily schedule right through the site and building process!

14 m high retaining wall

The walls of the building blocks are poured using the wall formwork system Mammut 350, the beams rely on StarTec. Slabs are poured conventionally with the MevaFlex slab formwork that on some floors is supported by MEP shoring towers up to 9 m high. One of the major challenges on this site is the 14 m high retaining wall between the metro and future commuter line. Large Mammut 350 panels, ganged several times, are supported by Triplex heavy duty braces.

22 m long beams precast on site

How do you transport 22 m long slab beams for the superstructure through Berlin’s notoriously congested city traffic? Simple answer: You don’t! In fact, they are precast on site in one go for reasons of cost-effectiveness and logistics. The hand-set formwork systems EcoAs and AluStar prove perfect for the job on account of their flexibility and easy handling.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.