PROJECT DATA

Building Tall with Imperial and STB

Project: New Emergency Room Facilities at William Beaumont Hospital in Royal Oak, MI

Contractor: Barton Malow

MEVA Systems: Wall formwork Imperial, Support frame STB 450 for single-sided pours, All-plastic facing alkus, Heavy-duty bracing Triplex

Engineering and support: MEVA Formwork Systems, Inc. Springfield, OH

 
 
1
2
 

Project

New high-tech emergency facilities at William Beaumont Hospital

The new Emergency Care Centre at the William Beaumont Hospital in Royal Oak, Michigan will cover 125,300 ft², nearly doubling the size of the current 70,000 ft² facility. The expansion will include 125 private rooms with a section dedicated to paediatric care. It will also feature a new rooftop helipad for critical emergencies.

Contractor Barton Malow chose MEVA’s heavy-duty wall system Imperial in combination with the STB support frame and heavy-duty Triplex braces to meet all needs for the foundations of the new Emergency Room facilities.

Heavy-duty, single-sided
The support frame STB 450 combined with the heavy-duty Imperial wall panels proved to be the ideal solution for the walls being poured against excavated ground. The Triplex braces were ideal for their flexibility in height adjustment and their strength to cope with the high pour loads.

STB 450 allowed for pours of up to 15 feet in a single pour
The frames required no assembly on site and are easily flown into place with the Imperial formwork set up ready for the pour.

With a load capacity of 2,025 psf, the Imperial is capable of taking any pour speed up to a height of 13 ft. without considering concrete type or climatic conditions.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.