PROJECT DATA

Europe's tallest Tower: Mirax "Federation" Tower in Moscow

Project: Mirax Tower Federazija

Contractor (and Architects): ANTYAPI, Istanbul/Türkei

MEVA Systems: Mammut wall formwork, all-plastic facing alkus

Formwork Engineering:  MosMEVA, Moscow/Russia

 
 
1
2
3
4
 

Project

Mirax Tower „Federazija“ in Moscow/Russia

Mammut is heading for a new height record

At the beginning of 2005, after a long planning phase, construction of a prominent building in Russia started. Right in the centre of "Moscow City" – an emerging residential and business quarter just about four kilometres from the Kremlin – the Mirax "Federation" Tower will become a dominant sight. The tall twin towers were designed by a German-Russian team of planners. After completion in 2007, the complex will not only house offices and luxury apartments with a total floor space of more than 400,000 square meters, but it will also be the tallest building in Europe. It is built with MEVA formwork systems.

In the past already, MEVA formwork systems convinced on outstanding construction projects with high quality and performance. A highlight, certainly, was the rebuilding of the "Saviour's Cathedral" in Moscow several years ago. The Turkish construction company ANT YAPI decided to use MEVA formwork systems on this half billion dollar complex. Based on triangular footprints the two glass-clad towers will face each other – one 342 m tall, the other 240 m. Both towers are´attached to a stiletto-like core spire (for lift and stair shafts) which will soar to 440 m into the Moscow sky. The cores of the 57-storey tower „B“ are formed with standard Mammut wall formwork. The plastic-faced (alkus) Mammut panels are applied on a customer-owned self-climbing construction. The decisive arguments in favour of the Mammut system were its high load capacity, rigidity, quality, positive experiences on earlier projects and its economic efficiency. In addition, the advantages of the alkus plastic facing had a positive effect on the decision. Whereas plywood facings would require numerous replacements because of the high number of reuses, the Mammut panels can be applied throughout the complete construction time and even far beyond without the need to ever change the plastic facing. Also, the alkus-facing is totally resistant against the expected, dramatic changes of weather. At present, one storey is completed every three days. We will keep you updated about the construction process in the future editions of FormworkPress.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.