PROJECT DATA

Office building and condominium "Victoria Park" in Sydney

Project: Office building and condominium "Victoria Park", Sydney

Contractor (and Architects): Priceright Construction (Brisbane)

MEVA Systems: slab formwork MevaDec

Formwork Engineering: MEVA Partner Novatec Constuction Systems (Yatala)

 
 
1
2
3
 

Project

Capitalize on a formwork system which reduces costs – even with plywood supplied by contractor

MevaDec used in primary-and-secondary-beam-method

The MevaDec slab formwork system covers all of the most important slab forming methods. According to the building geometry one can either apply a method which uses ready-made panels, or one where the forming face is supplied by the contractor. At any rate, you can make the most of the formwork system as you always use the same components for all the different applications.

The contractor Priceright Construction P/L from Sydney, Australia was awarded the formwork contract on the Victoria Park Project, Lot 302, consisting of four trapezoidal buildings with up to 12 storeys and a rather complex geometry. MEVA's Australian dealer, Novatec Construction Systems, proposed to form the slabs with the MevaDec HN method, which uses props, primary and secondary beams and plywood. By using this method the MevaDec system easily adapts to any required floor plan – even oblique or angular shapes, whilst permitting a class 2, or off-form concrete finish. The detailed formwork drawings for the 17 cm to 20 cm thick slabs were prepared by Thiess Consulting Engineers, on behalf of Novatec Construction Systems.

With HN-method all beams are mounted at the same level. The load-carrying system consists of primary beams and props with mounted drop heads. The secondary beams are hung into the primary beams at any position required to suit the nominal plywood spans. The prop spacing – and with it the number of required props – is determined by the length of the primary beams, thus avoiding the unnecessary use of additional props. The spacing of the primary beams is determined by the length of the secondary beams. Finally, 1.8 m x 1.2m x 18 mm plywood sheets were laid out as a soffit.

The easy handling and the use of only three basic components – prop with drop head, primary and secondary beam – guarantee the economical use of the formwork system. The drop-head allows for early stripping – as soon as 2-3 days (dependant on concrete strength). This clearly reduces the inventory and speeds up the construction process, whilst lowering labour costs and also providing a much cleaner open area that helps to address relevant safety concerns. The advantages of the MevaDec system were obvious, and Priceright Construction P/L has continued to utilise the same MevaDec system on all other projects they have undertaken in N.S.W. to date.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.