PROJECT DATA

Regional Medical Centre 10 weeks ahead of schedule with MEVA formwork solution

Project: Springfield Regional Medical Centre, OH 

Contractor: Danis Building Construction Miamisburg, OH

MEVA Systems: Wall formwork Imperial and MevaLite

Specifications: Springfield Regional Medical Centre had been in the planning stage for 10 years, and the $235 million facility was under construction for 2 years. The hospital is 475,000 ft² and accommodates for 254 private rooms. Danis Building Construction chose to use MEVA Imperial panels for the 20’ tall walls. After getting such great production numbers with Imperial they decided to bring in MevaLite for the Dock walls and shorter walls, instead of using their Symons fleet. There were 20 plus pours on this project.

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
4
5
6
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.