PROJECT DATA

RWE-Tower Dortmund: Flexible forming with MevaDec and alkus

Project: Administration building in Dortmund, Germany

Contractor (and Architects):  Oevermann GmbH & Co. KG, office Dortmund

MEVA Systems: MevaDec slab formwork (FTE-method), STB support frame

Formwork Engineering: Gerber Architekten, MEVA Formwork-Systems, office Rhein/Ruhr

 
 
1
2
3
4
 

Project

FTE-method and tailored panels with alkus-plastic facing

Standardized slab formwork systems have often no chance when round or elliptical slab layouts have to be formed. Not so for the eye-catching building which is currently under construction in the city centre of Dortmund. The so-called “RWE-Tower“, which was designed by the renowned Dortmund architects of “Gerber“, has a striking lenticular layout. With 22 storeys and a total height of approx. 100 m this office building will be the highest building in town and a major element of the Dortmund skyline.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.