PROJECT DATA

All formwork set up manually in just 2 days

Project: South Canal Bridge extension on Highway 400, Kettleby, Kings Township, Ontario, Canada

Contractor: Parkland Bridge & Concrete Group, Markham, ON, Canada

MEVA System: MevaLite wall formwork

MEVA engineering and support: Sales: Tamer Gerges Engineering: George Bobo

 
 
1
 

Project

South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

The job site is located in a well-traveled and populated area, with a park-n-ride area, culverts, and marshland all being factors for construction. With Highway 400 still highly active, there was no crane access available.

Chosen for its light weight and superior performance 

The contractor had to find a way to not only build up the formwork to the needed lengths and heights, but to also move all formwork from one side of the highway to the other to pour the wingwalls and bridge abutments – all without the use of a crane. This made MevaLite the hands-down best solution for the job. While offering all the advantages of a traditional clamp system and achieving a sturdy pour rating of up to 1,350 psf, it is so light that its panels can be transported and positioned by only one worker. This is ideal for job sites such as South Canal Bridge where assembly and stripping have to be done without a crane.

“MevaLite is so easy to handle, the workers love it” 

The contractor was able to completely set up the MevaLite formwork in just two days, saving time and labor, and keeping on schedule. All accessories are attached with the same size flange screw to the welded-in DW threads of the panels’ multi-function profiles – requiring less accessories on the cramped jobsite, reducing logistics and easing transport without a crane. The workers love the system and how easy it is to handle, put together and move. The contractor was also very happy with MEVA’s services.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

  • “Pick-up sticks” scaffolding in a very confined space

    “Pick-up sticks” scaffolding in a very confined space

    When construction companies think about the restoration of historic districts, their enthusiasm tends to be subdued. The foremen and their teams often face tricky tasks due to narrow access roads, lack of storage space and complicated logistics.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.