Areas with curved walls: Slide MD compensation beams (3) into the MD primary beams and place props with H20 beams (4) along the curved wall. Place the facing (2) for the filler area onto the MD compensation beams and H20 beams. Use several short H20 beams for wall curves with a small radius.
Other filler areas: Use H20 beams and a facing cut to size. Depending on the width of the filler area, the spacing of H20 beams may be limited to max. 50 cm.
(1) MevaDec panel
(5) Prop with drop head
Uniting functions currently scattered across 30 locations, Zurich's new Police and Justice Centre (PJZ) will house the cantonal police force, the prosecution authorities as well as police detention and prison facilities.
Ground broke on the new One City Center, also known as the “Durham City Center” in Durham, North Carolina in February 2016.
Construction is underway on a complex of 489 villas in the Nad Al Sheba area of Dubai.
A prominent hotel and apartment complex is taking shape in Dubai’s Al Qusais district.
Al Mankhool is located in western Dubai and crossed by Al Mankhool Road, also referred to as Bank Street.
The Lagoons is set to be a signature development within Dubai’s booming property sector, with unique offerings and a strategic location.
Ramps, architectural-concrete walls and ceilings, numerous concrete beams, rectangular and oval columns, rounded outside corners and bevelled inside corners.
Note that each building project will vary in terms of the number of parts needed. If you need assistance in planning the pour, please consult with us via the contact form.